1,309
Projects received by the system
1,309
Projects received by the system
864
Projects fully reviewed in production
6 min
Average review time per project
5 → 2 days
Completeness cycle compressed
More than half of submissions do not clear completeness on the first attempt — expired conditions, missing signatures, broken seals, composition gaps.
A completeness return is not a comment. It is days or weeks for the whole team while the package is rebuilt and resent.
Mechanical comparison of stamps, titles, validity dates, and set composition is necessary — and it is the wrong use of scarce specialist attention.
Recognize what each file is — narrative, design section, permit, survey, estimate — and place it in the package structure.
Compare the uploaded set with the required composition for the object type and the declared project contents.
Confirm that the documents belong to one project identity rather than a mixed or leftover archive.
Flag expired technical conditions, outdated editions, and documents that are no longer current at submission.
Page-level checks for signatures, seals, and machine-readable authenticity marks where the procedure requires them.
Reconcile the narrative composition with the uploaded sections and surface what is declared but missing.
Encode the consolidated intake rules for the authority and object types where the system runs.
Regulatory checks resolve against the editions that actually govern the submission.
Applicants and reviewers can see the AI findings — the same evidence, the same references.
Deploy inside the permitting authority or customer perimeter when packages cannot leave controlled infrastructure.
Every processed project strengthens the training signal for the next intake wave.
Works with Armeta Codes for regulatory lookup, Armeta Materials for item identity, and Smeta for estimate workflows.
Bring the documents, standards, and project context your team works with today.