Variation
A variation is the contract's licence for the employer's side to change the works — add, omit, alter — and the contractor's corresponding obligations: to comply with a properly instructed variation, and to be paid for it under the contract's valuation cascade. That cascade is the instrument's spine: contract rates where the work is of similar character and conditions; rates derived from them where it is comparable; fair valuation where nothing fits. Time consequences run in parallel through the extension-of-time machinery.
The instruct-first mechanics distinguish it from the North American change-order habit of agreeing scope, price and time before proceeding. Under variation regimes the work often cannot wait for the valuation — the contractor performs under instruction and the money is determined after, by the contract administrator if the parties cannot agree — which keeps the job moving and moves the argument to the paperwork.
The disputes are correspondingly predictable: whether an instruction was a variation at all or merely clarification of existing scope; whether the varied work's conditions still resemble those the rates assumed; and the cumulative effect of many variations on productivity — priced individually, felt collectively, claimed eventually.
Related reading
See this workflow in practice.
Book a demo to see how Armeta applies this concept across the drawings, standards, specifications, and project data that define the work.