Cost estimate

Last reviewed:
A forecast of the probable cost of a defined scope of work, produced at a specific level of design maturity and valid only for that scope, that maturity and that point in time.

A cost estimate is built by estimators from whatever project definition exists when it is prepared. Early in a project that may be little more than capacity figures and historical analogies; later it is full quantity take-offs priced line by line. A complete estimate covers direct costs, indirect costs, escalation and contingency, and it should always state its basis: which drawing revisions, which price date, which exclusions.

Estimates mature in recognised stages — from order-of-magnitude through to definitive — and every estimating organisation classifies them by how much design definition sits underneath. The number is only as reliable as that definition; an estimate quoted without its class and basis is a number without meaning.

Where estimates go wrong is rarely arithmetic. It is scope drift: the design moves on, the estimate does not, and decisions continue to be made against a figure that no longer describes the project. The discipline of restating the estimate whenever the basis changes is what separates cost control from cost surprise.

See this workflow in practice.

Book a demo to see how Armeta applies this concept across the drawings, standards, specifications, and project data that define the work.