Skip to content
Workflows

The P&ID-dependent workflows Armeta transforms.

Each workflow page explains the current manual process, the regulatory or commercial context it sits inside, and the structured output Armeta produces. Written for the engineers, compliance leads, and project teams who run these workflows today.

All workflows

Seven workflows. One drawing dependency.

Automated MTO extraction carries the most frequently repeated P&ID-dependent workflow across every role. MOC reconciliation and PHA revalidation carry the process safety program. LDAR component inventory carries the fugitive emissions program. Brownfield migration, as-built reconciliation, and turnaround preparation carry the project and operating work. Every one depends on reading every P&ID correctly.

C.1
Automated MTO

Automated MTO extraction from P&IDs

The most frequently repeated P&ID-dependent workflow across every role in the value chain. Every equipment item, line, valve, instrument, and connector structured and auditable in hours rather than weeks.

Read the workflow
C.2
MOC Reconciliation

Automated MOC reconciliation

Every Management of Change that affects physical equipment must update the governing P&ID. Armeta produces structured revision deltas and audit-ready MOC packages.

Read the workflow
C.3
PHA Revalidation

Accelerated PHA revalidation

PSI preparation ahead of the five-year HAZOP revalidation compresses from six to nine months down to six to ten weeks. Structured P&IDs with revision deltas pre-flagged before the HAZOP team arrives.

Read the workflow
C.4
LDAR Inventory

Drawing-traceable LDAR component inventory

LDAR-regulated components extracted directly from the governing P&IDs. Every valve, pump seal, flange, and connector traceable back to its source drawing for audit defense.

Read the workflow
C.5
Brownfield Migration

Brownfield data migration

Legacy P&ID archives — PDF scans, historical CAD, multi-contractor inheritance — decoded into a structured, connected engineering graph. Days instead of months to lock in revamp scope.

Read the workflow
C.6
As-Built Reconciliation

As-built reconciliation

Structured deltas between any two revisions of a P&ID. As-built handover becomes a drawing-traceable change log instead of a months-long drafting exercise.

Read the workflow

If there's a P&ID-dependent workflow you want documented here, contact the Armeta team.

Get started

Put a workflow to work on your drawings.

See Armeta run on a representative P&ID in a 30-minute demo, or send us up to ten of your own drawings for a full extraction report.